Skip to content
TyltTylt.
Pilot10 of 15 pilot partner spots remaining
5 / 15 filled
Workers at $12.50/hr — 50% off for your first 6 monthsClaim a spot →
Pilot10 of 15 spots leftClaim a spot →
Manufacturing · Distribution · Industrial

SAP is bookeduntil 2028.

Ship the sidecar your dealers and ops team needed yesterday.

ERP handles the core. Everything else — dealer portals, inventory buffers, configurator, field reporting — waits in IT backlog. Tylt builds production sidecars that integrate without rip-and-replace. Senior engineers, product specs, shipped in days.

Book a scoping callSee how it works →
ERP-adjacent builds — no rip-and-replace
Dealer & distributor portals
Named senior engineer on every project
Tylt Workspace · Dealer portal · Inventory view
integration · SAP read-only API
4-week delivery · zero ERP changes
Shipped — dealer order status & ATP view
Dealer login — SSO + territory scoping
would ship
ATP / inventory buffer display
would ship
Order submit — SAP IDoc hook + confirmation
flagged
Configurator — SKU rules + lead time calc
review
Admin — dealer tier pricing override audit
would ship
internal IT queue: 14 monthsTylt sidecar: 4 weeks live
14 mo
Typical internal IT backlog for custom tools
Faster than agency discovery + build
67%
Lower cost vs traditional agency
0
ERP rip-and-replace required
The manufacturing CIO

You're not a software company — except you are

Dealers want portals. Ops wants visibility. ERP vendors want a two-year project. You need something shippable this quarter.

Tylt for manufacturing
Sidecars that read/write ERP without replacing it
Product lead translates ops and dealer asks into scope
Senior engineer owns integration safety and audit trails
Dealer portals, configurators, field apps — production grade
Fixed price when internal IT can't even quote a date
Big SI + offshore maintenance
18-month SI proposal for a 4-week problem
Offshore maintains legacy — won't touch dealer UX
You become the BA for every field edge case
Integration breaks when ERP patches Friday night
Dealers call sales because the portal doesn't work
Industrial software

Portals, visibility, and ERP glue

When the ERP roadmap doesn't match business reality.

Dealer & distributor portals

Order status, ATP, pricing tiers — scoped to territory and role.

ERP integration

Read-only first, controlled writes — no rip-and-replace.

Ops visibility

Inventory buffers, exceptions, and reporting your planners asked for.
The delivery model

From messy ask to production in days

No six-week discovery phase. No ticket queue. One continuous loop — spec, build, eval, ship — with senior people accountable at every step.

01

Your ask

A Slack message, a 30-minute call, a messy paragraph — however you actually communicate today.

02

Product spec

Our product lead returns scope, success metrics, and what we're not doing — same day.

03

Senior review

A named engineer signs off on approach, risks, and architecture before a line ships.

04

Build & eval

Agentic workers build at speed; seniors review every merge. Shadow eval on your data.

05

Production

Staging in days, pilot in weeks. Handoff docs, observability, 30-day fix window.

The formula

It takes all three.

A model supplies none of what makes great software. You bring the product expertise — what to build and how you'll know it's right. We bring the AI and engineering expertise, plus the agentic system that turns it into reviewed, production-grade code. Drop any one of the three and you get plausible code that doesn't fit, doesn't scale, or never ships.

You bring this

Product expertise

Your product expert

One person on your side owns what to build and how you'll know it's right — the requirements up front and the acceptance testing at the end. Nobody knows your business like you do.

It does what your business actually needs
Tylt brings this

AI + engineering expertise

An AI-native senior engineer

One of our top engineers — fluent in both the model and the architecture — owns the quality bar, reviews everything the agents produce, and rejects what only looks right.

It works as expected and scales to your daily active users
Tylt brings this

The system we built

Our agentic worker system

A purpose-built harness puts a configurable fleet of agent workers to work under that engineer's direction, doing the physical build at speed. Dial it up or down to match your pace.

  • Coding
  • Specs
  • Documentation
  • Testing
  • Deployment
It ships fast, without the headcount or the bill

= a great product

Software that does exactly what it's supposed to do — and scales to the daily active users you need it to.

Three options

Agency vs DIY vs Tylt

Traditional agencies charge human rates for work AI now handles. DIY tools ship fast — then leak secrets and pile up debt. Tylt is the third option.

Tylt
  • Senior product oversight
  • 60%+ cost savings vs agency
  • Production-grade quality
  • Ship in days, not quarters
  • You own all code & IP
  • Same-day patch support
  • No AI expertise needed from you
Traditional agency
  • Senior product oversight
  • 60%+ cost savings vs agency
  • Production-grade quality
  • Ship in days, not quarters
  • You own all code & IP
  • Same-day patch support
  • No AI expertise needed from you
DIY vibe coding
  • Senior product oversight
  • 60%+ cost savings vs agency
  • Production-grade quality
  • Ship in days, not quarters
  • You own all code & IP
  • Same-day patch support
  • No AI expertise needed from you
First sidecar

One portal or one integration

The tool sales promised dealers last quarter.

Technical review

ERP APIs, data boundaries, and fixed scope in week one.
  • Read-only start
  • Senior architect
  • Fixed price

Build & pilot

One dealer cohort or one plant on staging, then production.
  • Audit logs
  • Rollback plan
  • Runbooks

Expand

More dealers, plants, or workflows — same team or handoff.
  • No lock-in
  • Scale month to month
  • 100% IP yours

Run the numbers

Manufacturing: Tylt vs SI quote

Compare calendar time and fully loaded cost — not ERP vendor roadmap.

Your current team

Tick “Uses AI” for anyone already on Claude Code, Copilot, etc.
$/yr
$/yr
$/yr

Assumptions

1.30×

Base salary → true cost (benefits, tax, equipment, overhead). Industry standard ≈ 1.3×.

360 hrs

How much agent time it takes us to deliver one developer-month of reviewed output. Higher = more conservative.

Cost reduction vs your in-house team

74%less with Tylt

Your team, loaded

$52,000/mo

With Tylt

$13,690/mo

You save / year

$459,720

$38,310/mo · ~1.4 effective dev-months matched

Get this quote
FAQ

Manufacturing software development FAQ

ERP integration, dealers, and sidecar architecture.

Send the dealer or ops ask IT couldn't schedule

Spec, integration approach, fixed price — five business days.

Typical reply within a few hours · Pilot spots via the bar above